Roads Subsector Development Performance Upgrading roads to bitumen standard: 0 Km was achieved against a target of 10.0Km representing a performance of 0.0%, Concrete Block Paving (Cabro): 1.44 Km was achieved Graveling roads: 38.4 Km was achieved against a target of 40Km representing a performance of 96.0%, Grading roads: 453.25 Km was achieved against a target of 300Km representing a…
Roads Subsector Development Performance Upgrading roads to bitumen standard: 0 Km was achieved against a target of 10.0Km representing a performance of 0.0%, Concrete Block Paving (Cabro): 1.44 Km was achieved Graveling roads: 38.4 Km was achieved against a target of 40Km representing a performance of 96.0%, Grading roads: 453.25 Km was achieved against a target of 300Km representing a performance of 151.08%, Opening of new county roads: 119.25 Km was achieved. Constructing drifts across seasonal rivers: 7 Drifts were constructed. Installing cross and access culverts: 141 lines were installed Demarcation of county roads: 10Km of roads were demarcated Public works and Government buildings Subsector Performance Renovation of staff houses: 0 Houses were renovated against a target of 10 representing a performance of 0.0%. County Public Lighting & Electrification Subsector Performance Installing Flood lights at major trading centers and estates: 1 Flood light was installed Installing Street lights along major roads 21 street lights schemes were implemented against a target of 10 representing a performance of 210%.